Doesn't surprise me.
When I was at college I worked as a potwash with an ex-leyland worker who was at the plant pretty much for the duration of the metro. He said night shifts usually belted out the quota in about 2 hours and slept for the other 5.
(
Slippery Mick ‏, Fri 9 Mar 2012, 12:30,
archived)