b3ta.com links
You are not logged in. Login or Signup
Home » links » Link 1527617 | Random (Thread)

This is a normal post
So my point about the timescale stands. ThrustSSC was five years from design to breaking the record. Bloodhound is still doing low-speed runs 11 years after the project was initially announced.
(, Mon 28 Oct 2019, 10:28, Reply)
This is a normal post They’ve had a fair bit of funding trouble though
While Thrust 2 and SSC both had their own difficulties, I don’t recall them being shut down repeatedly.
(, Mon 28 Oct 2019, 13:44, Reply)