My Biggest Disappointment
Often the things we look forward to the most turn out to be a huge let down. As Freddy Woo puts it, "High heels in bed? No fun at all. Porn has a lot to answer for."
Well, Freddy, you are supposed to get someone else to wear them.
What's disappointed you lot?
null points for 'This QOTW'
( , Thu 26 Jun 2008, 14:15)
Often the things we look forward to the most turn out to be a huge let down. As Freddy Woo puts it, "High heels in bed? No fun at all. Porn has a lot to answer for."
Well, Freddy, you are supposed to get someone else to wear them.
What's disappointed you lot?
null points for 'This QOTW'
( , Thu 26 Jun 2008, 14:15)
« Go Back
biggest disappointment of today
is having been at work since about 7am with no signs of going home yet and having to cancel the pub in the lovely golden evening sunshine....... gah. i hate my life sometimes!
( , Tue 1 Jul 2008, 18:28, 10 replies)
is having been at work since about 7am with no signs of going home yet and having to cancel the pub in the lovely golden evening sunshine....... gah. i hate my life sometimes!
( , Tue 1 Jul 2008, 18:28, 10 replies)
And that is why
you can have 750 quid handbags. :-p
At least I'm here with you, kiddo.
( , Tue 1 Jul 2008, 18:33, closed)
you can have 750 quid handbags. :-p
At least I'm here with you, kiddo.
( , Tue 1 Jul 2008, 18:33, closed)
yay!
you can distract me from the tedium of drafting 1927 Act notices!!
which is a very high rate of tedium...
( , Tue 1 Jul 2008, 18:35, closed)
you can distract me from the tedium of drafting 1927 Act notices!!
which is a very high rate of tedium...
( , Tue 1 Jul 2008, 18:35, closed)
I shouldn't laugh...
But the Loon beat me to it....
If you want your lovely handbags....
Don't forget to take time out when you can though...all work and no play makesJill Rachel a dull girl!
;)
( , Tue 1 Jul 2008, 18:38, closed)
But the Loon beat me to it....
If you want your lovely handbags....
Don't forget to take time out when you can though...all work and no play makes
;)
( , Tue 1 Jul 2008, 18:38, closed)
We all have our crosses to bear.
I have to work with my pain in the neck of a step father for a boss so I can have the privileges working for family entails.
(Love him really)
( , Tue 1 Jul 2008, 18:39, closed)
I have to work with my pain in the neck of a step father for a boss so I can have the privileges working for family entails.
(Love him really)
( , Tue 1 Jul 2008, 18:39, closed)
hmph
haven't been able to use the Handbag yet. it's not been waterproofed. must get on with it actually.
( , Tue 1 Jul 2008, 18:43, closed)
haven't been able to use the Handbag yet. it's not been waterproofed. must get on with it actually.
( , Tue 1 Jul 2008, 18:43, closed)
Could be worse.
1. Reference sheet I02-01/I02-02 and 11352-2.6.C.1. Per the submittal IDI will be supplying three(3) Ashcroft pressure gauges for the discharge side of the DAF recycle pumps. Please provide the two pressure gauges shown in the referenced sheets attached to the Air Saturation Vessel as well. Also provide documentation that all pressure indicators and gauges will be diaphragm sealed as shown on the contract documents.
Ashcroft pressure indicating transmitters are mounted to the saturator vessel level control. IDI has not supplied mechanical gauges for this location since the local digital readout is available for pressure indication.
2. Reference sheet I02-01/I02-02 and 11352-2.12.D. IDI states that the Spec’d Ametek air saturator level control will not work and proposes the Magnetrol system as an alternate. The Ametek system uses a three level switch system High, Low, and Low-Low. The information provided shows the Magnetrol system utilizing a high and low switch without a Low-Low switch as specified. Provide the Low-Low switch per the contract documents. Provide wiring diagram/schematics for solid state relay enclosure and associated technical data.
The Magnetrol level control is equipped with three OES-100 limit switches which act as High, Low, and Low-Low. Switches are DPDT and no relay enclosure is needed.
Does that sound less tedious to you?
Didn't think so.
( , Tue 1 Jul 2008, 18:49, closed)
1. Reference sheet I02-01/I02-02 and 11352-2.6.C.1. Per the submittal IDI will be supplying three(3) Ashcroft pressure gauges for the discharge side of the DAF recycle pumps. Please provide the two pressure gauges shown in the referenced sheets attached to the Air Saturation Vessel as well. Also provide documentation that all pressure indicators and gauges will be diaphragm sealed as shown on the contract documents.
Ashcroft pressure indicating transmitters are mounted to the saturator vessel level control. IDI has not supplied mechanical gauges for this location since the local digital readout is available for pressure indication.
2. Reference sheet I02-01/I02-02 and 11352-2.12.D. IDI states that the Spec’d Ametek air saturator level control will not work and proposes the Magnetrol system as an alternate. The Ametek system uses a three level switch system High, Low, and Low-Low. The information provided shows the Magnetrol system utilizing a high and low switch without a Low-Low switch as specified. Provide the Low-Low switch per the contract documents. Provide wiring diagram/schematics for solid state relay enclosure and associated technical data.
The Magnetrol level control is equipped with three OES-100 limit switches which act as High, Low, and Low-Low. Switches are DPDT and no relay enclosure is needed.
Does that sound less tedious to you?
Didn't think so.
( , Tue 1 Jul 2008, 18:49, closed)
i think it's a draw...
The Right to Compensation
The basic theory is that the tenant of premises included within the Act is entitled to be paid compensation by his landlord at the end of the tenancy for any improvements that he or his predecessor has made that add to the letting value of the property. However, for the claim to be valid, it must be made in the manner prescribed by the Act and it must be made within the statutory time limits.
( , Tue 1 Jul 2008, 18:56, closed)
The Right to Compensation
The basic theory is that the tenant of premises included within the Act is entitled to be paid compensation by his landlord at the end of the tenancy for any improvements that he or his predecessor has made that add to the letting value of the property. However, for the claim to be valid, it must be made in the manner prescribed by the Act and it must be made within the statutory time limits.
( , Tue 1 Jul 2008, 18:56, closed)
Look on the bright side
you're going to be out of there before I'll be out of here- it's only 2:30 over here!
( , Tue 1 Jul 2008, 19:28, closed)
you're going to be out of there before I'll be out of here- it's only 2:30 over here!
( , Tue 1 Jul 2008, 19:28, closed)
You think you got it bad?
It's 00:46am here in India, and i'm still at work.... trying to repair a failed Active Directory schema.
Go me.
Edit: 01:22am, still here....
Edit:: 01:43am, just repaired Bangalore's AD partition, now restoring sydney.....
*Yaaaaaawn*
( , Tue 1 Jul 2008, 20:16, closed)
It's 00:46am here in India, and i'm still at work.... trying to repair a failed Active Directory schema.
Go me.
Edit: 01:22am, still here....
Edit:: 01:43am, just repaired Bangalore's AD partition, now restoring sydney.....
*Yaaaaaawn*
( , Tue 1 Jul 2008, 20:16, closed)
I'm still working too
although I am at home.
But I have had to deal with 30 10-year-olds all day!!
( , Tue 1 Jul 2008, 21:28, closed)
although I am at home.
But I have had to deal with 30 10-year-olds all day!!
( , Tue 1 Jul 2008, 21:28, closed)
« Go Back